Asbestos Management Surveys

You cannot manage asbestos you have not found.

A management survey locates the asbestos containing materials in the parts of a building that could be disturbed during normal occupancy and maintenance. It is the survey that underpins the duty to manage, and the data that your management plan is built from.

What we do

The surveyor reviews existing documentation first: previous reports, registers and building plans. A preliminary walkaround identifies immediate hazards and sets the methodology. Detailed visual inspections then cover all accessible areas in scope, recording ceiling, wall and floor information for each room. Suspect materials are sampled for laboratory analysis, or presumed to contain asbestos where sampling is not feasible. Each material is then assessed against HSE guidance for condition, damage and deterioration, and given a risk rating. Where a priority assessment is also required, input from someone who knows the building's usage, occupancy and maintenance routines feeds into it.

What you get

  • One report, detailing:
  • Asbestos findings summary and remedial actions summary
  • Asbestos locations summary and a full asbestos register with location, type, condition and risk
  • Non-accessed areas summary, listing everything presumed to contain asbestos until proven otherwise
  • Scope of survey and any agreed exclusions
  • Material assessments with photographs
  • Non-asbestos sample register and accessed areas register
  • Floor plans with ACM locations marked
  • Laboratory certificates of analysis

Why it matters

A management survey inspects surface materials that could be disturbed day to day, with some minor intrusive work such as lifting ceiling tiles or carpet tiles. It is not exhaustive, and the report says so. Anything inaccessible is presumed to contain asbestos, which is the honest position and the one that protects a maintenance contractor.

Why Vantify

Sampling carried out to established procedures: access restricted, materials suppressed, samples repaired afterwards, and debris cleaned and disposed of as hazardous waste.

Scope and limitations

Typically excluded unless agreed and access arranged in advance: within or beyond solid structural elements; sealed roof and ceiling voids; sealed floor ducts, voids or subterranean areas; beneath fitted and sealed floor coverings; beneath fixed or raised flooring; within fire doors, behind door and window frames and beneath sills; within sealed boxing or risers with no hatch; within live electrical equipment, machinery, plant and services; and within confined spaces.